PAC and SAC cleanroom solutions — engineered around your process.
Whether you need a fully pre-assembled unit delivered ready-to-use or a site-assembled system built to your exact layout, we have the right solution.
Fully integrated cleanroom modules — factory-built, pre-qualified, and delivered ready to plug in. The fastest path to a production-ready environment.
Custom-configured cleanroom systems assembled on-site using modular panel systems. Ideal for large-scale facilities or complex layouts requiring a tailored approach.
Each PAC unit arrives as a complete, self-contained cleanroom — HVAC, filtration, lighting, and controls already integrated and validated. Install in days, not months.
Selected projects showing how factory integration shortens site work and accelerates qualification.
PAC
Completed in China in 2025, this 190 m² PAC cleanroom provides a controlled environment for pharmaceutical operations without a specified ISO classification.
View case study
PAC
Completed in the United States in 2020, this 150 m² PAC cleanroom provides an ISO 7 environment for biopharmaceutical applications.
View case study
PAC
Completed in Malaysia in 2024, this 126 m² PAC cleanroom provides an ISO 8 environment for biopharmaceutical applications.
View case study
PAC
Delivered to Iraq in 2025, this 28 m² PAC laboratory integrates crude oil testing functions within a 40-foot container.
View case study
PAC
Completed in Shanghai in 2026, this 240 m² PAC modular laboratory provides an ISO 8 environment for biopharmaceutical applications.
View case study
SAC systems are engineered to your exact layout and assembled on-site using modular wall and ceiling panels. Ideal for large-scale facilities or complex geometries that require a tailored approach.
Selected large and complex facilities shaped around process equipment, base buildings and phased installation programs.
SAC
Completed in Changchun, China, in 2025, this 130 m² SAC cleanroom provides ISO 7 and ISO 8 controlled areas for injection molding operations.
View case study
SAC
Completed in Kunshan in 2020, this 5,000 m² SAC semiconductor cleanroom targets ISO 7 across a large production area.
View case study
SAC
Completed in Malaysia in 2023, this 30 m² SAC cleanroom targets ISO 8 for electronic component operations.
View case study
SAC
Completed in Changchun in 2020, this compact 25 m² SAC cleanroom targets ISO 8 for automotive component operations.
View case study
SAC
Completed in Germany in 2024, this 161 m² SAC cleanroom provides an ISO 7 environment for automotive component operations.
View case studySend us your process requirements and we'll recommend the optimal solution.