Delivering Cleanrooms Worldwide
Home / Solutions / PAC · Case Study
PAC · Case Study

Shanghai 240 m² PAC Modular Biopharmaceutical Laboratory

Completed in Shanghai in 2026, this 240 m² PAC modular laboratory provides an ISO 8 environment for biopharmaceutical applications.

Completed in Shanghai in 2026, this project supplied approximately 240 m² of ISO 8 laboratory space for biopharmaceutical use. The brief specified a PAC format suitable for factory pre-assembly, transport, and connection at the destination. Wonclean supplied pre-assembled modular laboratory units rather than building the full enclosure room by room at the site. The scope covered modular walls and cleanroom ceiling panels, HVAC and filtration, lighting, electrical systems, automation, monitoring, module installation, commissioning, and validation. The prefabricated laboratory approach brought several coordinated elements together before shipment while leaving final site interfaces to be completed after delivery. Its recorded lead time was three months. At 240 m², this case is larger than a single small research pod and shows how PAC can be applied to a more substantial laboratory requirement. The available public data does not describe the research process or equipment list.

Shanghai 240 m² PAC Modular Biopharmaceutical Laboratory
240 m² Controlled area
3 months Delivery
ISO 8 Cleanroom class
01
THE CHALLENGE

Working Around Real Project Constraints

Create approximately 240 m² of ISO 8 modular laboratory space suitable for factory pre-assembly, transport and site connection.

02
THE SOLUTION

Engineered for the Process

Pre-assembled PAC laboratory modules provided approximately 240 m² of ISO 8 space for biopharmaceutical use in Shanghai.

SCOPE OF DELIVERY

A Coordinated Cleanroom Package

The project package was coordinated as a complete system, keeping architectural, mechanical and controls interfaces aligned from design through qualification.

  • 01Pre-assembled modular walls and ceiling for a 240 m² biopharmaceutical modular laboratory
  • 02HVAC and filtration serving the ISO 8 clean space
  • 03Lighting, electrical, automation and monitoring systems
  • 04On-site module installation, commissioning and validation
START YOUR PROJECT

Planning a Similar Cleanroom?

Share your process, classification and schedule requirements. Our team will recommend the right PAC or SAC approach.