Completed in Germany in 2024, this 161 m² project provided an ISO 7 clean environment for automotive component operations. The client required the clean space to fit an overseas site and its equipment layout, so the enclosure had to be coordinated with the building conditions rather than treated as a standalone box. The SAC modular cleanroom was assembled on site using a wall-and-ceiling package. Its scope also covered HVAC and filtration, lighting, electrical systems, automation, monitoring, commissioning, and validation. In this form of cleanroom construction, each cleanroom partition wall helps define the controlled area while service connections are planned around the operational footprint. The recorded delivery period was two months. The case demonstrates the use of a compact, site-assembled solution for an industrial application outside pharmaceuticals. It does not disclose the manufacturer, equipment specifications, or measured production outcomes.
Provide approximately 161 m² of ISO 7 clean space for automotive component operations and adapt it to the overseas site and equipment layout.
A site-assembled SAC modular cleanroom provided 161 m² of ISO 7 space for automotive component operations in Germany.
The project package was coordinated as a complete system, keeping architectural, mechanical and controls interfaces aligned from design through qualification.
Share your process, classification and schedule requirements. Our team will recommend the right PAC or SAC approach.