Delivering Cleanrooms Worldwide
Home / Solutions / PAC · Case Study
PAC · Case Study

30 m² PAC Modular Biopharmaceutical Laboratory

Completed in China in 2022, this 30 m² PAC modular laboratory provides an ISO 8 environment for biopharmaceutical applications.

Delivered in China in 2022, this 30 m² project created an ISO 8 environment for biopharmaceutical research. The client needed a compact laboratory that could be prepared before shipment, transported, and connected quickly at its destination. Wonclean used a PAC modular laboratory format, bringing the enclosure and key building services together as a pre-assembled package. The scope covered the walls and ceiling, HVAC and filtration, lighting and electrical systems, automation, monitoring, installation, commissioning, and validation. As a prefabricated cleanroom solution, the unit concentrated more work before arrival on site than a conventional room-by-room build. The one-month delivery period reflects the small footprint and the selected PAC configuration. This portable laboratory example is relevant where a research team needs a defined clean environment but has limited space or a short implementation window. Client identity and process details remain confidential.

30 m² PAC Modular Biopharmaceutical Laboratory
30 m² Controlled area
1 month Delivery
ISO 8 Cleanroom class
01
THE CHALLENGE

Working Around Real Project Constraints

Create a compact 30 m² ISO 8 laboratory suitable for factory pre-assembly, transport and rapid site connection.

02
THE SOLUTION

Engineered for the Process

A pre-assembled PAC modular laboratory provided 30 m² of ISO 8 space for biopharmaceutical research in China.

SCOPE OF DELIVERY

A Coordinated Cleanroom Package

The project package was coordinated as a complete system, keeping architectural, mechanical and controls interfaces aligned from design through qualification.

  • 01Pre-assembled modular walls and ceiling for a 30 m² biopharmaceutical modular laboratory
  • 02HVAC and filtration serving the ISO 8 clean space
  • 03Lighting, electrical, automation and monitoring systems
  • 04On-site module installation, commissioning and validation
START YOUR PROJECT

Planning a Similar Cleanroom?

Share your process, classification and schedule requirements. Our team will recommend the right PAC or SAC approach.